Do I need a designer or can the contractor handle layout?expand_more
For a same-footprint remodel, an experienced remodeler and a cabinet designer usually cover it. Once you're moving walls or windows, bring in a designer or architect early — it costs less than discovering mid-demo that the change needs an engineered beam.
How far ahead should I book?expand_more
Good local remodelers here are commonly scheduling two to five months out, and spring booking fills earliest. Start conversations well before you want to start work, and treat immediate availability as a question worth asking about rather than a lucky break.
What's a fair payment schedule?expand_more
A modest deposit at signing, then progress payments tied to milestones like cabinet delivery and countertop install, with a final payment after the punch list is finished. Washington limits how contractors can handle deposits, and a demand for half up front in cash is a strong signal to walk.
Will I need to update the electrical panel?expand_more
Sometimes. Current code wants dedicated circuits for the small appliance counters, the dishwasher, the disposal, and the range, and older panels here occasionally lack the space. It's a few hundred dollars if there's room and a few thousand if the service needs upgrading, so get it assessed before the budget is locked.
Can I keep using the kitchen during the work?expand_more
Partly. Most households set up a temporary counter with the fridge and microwave in the dining room or garage and plan on four to six weeks without a sink. Ask your contractor to sequence the plumbing so the outage is one block rather than several.