Can my old deck frame be reused with new decking?expand_more
Sometimes, and it's worth checking because it saves real money. The builder should probe the joists and ledger, look at the hardware, and confirm the framing meets current spacing for the decking you want. If the frame is soft anywhere or the ledger flashing is questionable, rebuilding is the cheaper decision over time.
What time of year is best to build?expand_more
Framing and decking happen year-round here, though winter mud on acreage makes access harder and concrete for footings needs care in a freeze. Spring booking fills fast because everyone wants the deck done by June — reach out over the winter for the best schedule.
How long does a deck take to build?expand_more
A straightforward 300 to 400 square foot deck is typically one to two weeks on site once materials are staged. Add a roof, stairs down a slope, or built-in seating and it stretches. Permitting and inspection scheduling usually adds more time than the carpentry does.
Do I need a survey before fencing?expand_more
If the line is at all uncertain, yes. Building on the wrong side of a boundary is one of the more painful mistakes out here, since moving a completed fence costs as much as building it. Existing pins and a recent survey are worth locating before the posts go in.
Does every Battle Ground deck need a permit?expand_more
City and County guidance use project details such as height, attachment, area and use. Confirm the parcel and complete design with the responsible authority.
What should be checked before reusing a deck frame?expand_more
Review footings, posts, beams, joists, ledger, connectors, decay, movement, spacing and compatibility with the selected decking.
Who owns ledger flashing and siding restoration?expand_more
Assign removal, water-management details, inspection access, siding repair and warranty responsibility in the contract.
What should I receive at closeout?expand_more
Keep permit and inspection status, concealed-work photos, product and fastener records, care instructions, approved changes and a resolved punch list.