How long will my bathroom be out of service?expand_more
A cosmetic refresh is often two weeks. A full gut with a tiled shower is more realistically three to five weeks, because waterproofing, tile, and grout each need cure time that can't be rushed. If it's the only bathroom in the house, say so up front so the contractor can sequence the work tightly.
Is a tile shower better than a solid surround?expand_more
Tile looks better and lasts if the waterproofing behind it is done properly; a quality acrylic or solid-surface surround is faster, cheaper, and genuinely easier to clean. Neither is wrong. What matters far more is who installed it and whether the pan and membrane were done right.
Do I need a permit for a tub-to-shower conversion?expand_more
Usually yes, since the drain moves and the plumbing changes. It's a straightforward permit and the inspection protects you. Skipping it tends to surface later during a sale when an inspector notices unpermitted work.
What should I expect on well water?expand_more
Hard or iron-rich water spots glass and stains grout quickly, so consider a filter as part of the project and choose finishes that hide mineral marks. Brushed finishes and larger-format tile with less grout line are more forgiving than polished chrome and small mosaics.
Does the quote include Washington sales tax?expand_more
Ask, because it is often the difference between two bids that otherwise look identical. Washington charges retail sales tax on construction labour as well as materials, which is unusual and catches people out. On a $25,000 remodel the tax is a real number, so confirm in writing whether the figure you have been given includes it.
Do I need a permit if I am only replacing the vanity and tiling?expand_more
If the fixtures stay in the same place and no new circuits are run, a like-for-like swap generally does not need one. The moment a drain moves, a wall opens, or an electrical circuit is added, it does. Your contractor should pull it under their own registration, and you should decline any suggestion that you pull it as the homeowner to save time.
How do I tell a good bid from a cheap one?expand_more
Read what is written down rather than what is totalled. A sound bid names the waterproofing system, says who supplies the fixtures, states the allowance for tile, and describes what happens if rot is found. A cheap bid is usually cheap because those lines are missing, not because the contractor is more efficient. Get two or three and compare the scopes side by side before you compare the numbers.
What does this service cost me?expand_more
Nothing. Describing the project and receiving quotes is free, and there is no fee if you hire someone. You pay your contractor for the work, and that is the entire arrangement.
How many contractors will contact me?expand_more
Usually two to four, matched on trade, project size and whether they genuinely work your area. Only those matched to your job see your details — we do not resell requests.